Check List
A) Auto production
1. Is your factory on a slightly elevated site, outside of an environmental designated area?
2. Is your intended site located more than 400 metres from the nearest dwelling house?
3. Do you have a minimum transformer export/import capacity of at least 400KVA?
4. Are you committed to powering your plant with green energy?
5. Do you want to lower energy costs and fix them for the next 20 years?
6. Do you want positive PR for your company?
Installations to date have shown the following typical economic benefits over a 20 year 1 turbine lifetime:
- Typical returns on capital invested of approximately 14 - 20%
- Internal rate of returns from 15 - 20%
- Net present values of 130 - 160% on a 20 year investment
- Electricity purchased at a fixed price between 9 - 11c/kWh for 20 years
Our turbines not only fix your energy price for 20 years, they also provide additional income for your facility.
B) 500kw wind turbine installations
1) Do you have an elevated windy site?
2) Do you have a grid connection close by? We can advise.
3) Do you want to generate an income from your land and still farm it?
4) Don't have the expertise to build a wind farm but would like to have wind turbines on your land?
5) Is your intended site located more than 260m away from the nearest dwelling?
6) Do you wish to receive annual rental payments, government backed and CPI indexed linked?



